Homeβ€ΊServicesβ€ΊCloud Migration
ZERO DATA LOSS

Cloud Migration
Seamless On-Prem to Cloud Transitions

Plan and execute cloud migrations with zero data loss and minimal downtime β€” whether you are lifting and shifting existing workloads or re-architecting for cloud-native performance.

Request a Consultation

Complete Cloud Migration Services

Plan and execute cloud migrations with zero data loss and minimal downtime β€” whether you are lifting and shifting existing workloads or re-architecting for cloud-native performance.

πŸ“‹

Migration Assessment & Planning

Thorough discovery of your existing environment before a single workload moves.

  • βœ“ Application dependency mapping
  • βœ“ TCO and ROI analysis
  • βœ“ Migration wave planning
  • βœ“ Risk assessment per workload
  • βœ“ Rollback strategy for each migration
πŸš€

Lift & Shift (Rehost)

Move existing workloads to the cloud with minimal changes β€” fastest path to cloud.

  • βœ“ VM replication with AWS MGN, Azure Migrate
  • βœ“ Physical-to-virtual (P2V) conversion
  • βœ“ Storage migration with delta sync
  • βœ“ Network and DNS cutover planning
  • βœ“ Zero-downtime cutover execution
πŸ”§

Replatform & Re-architect

Modernise applications during migration for better performance and lower cost.

  • βœ“ Database migration to managed RDS/Azure SQL
  • βœ“ Containerisation with Docker and Kubernetes
  • βœ“ Serverless refactoring for suitable workloads
  • βœ“ Microservices decomposition planning
  • βœ“ CI/CD pipeline implementation
πŸ—„οΈ

Database Migration

Complex database migrations executed with data integrity guarantees.

  • βœ“ MySQL, PostgreSQL, MSSQL, Oracle migration
  • βœ“ Homogeneous and heterogeneous migrations
  • βœ“ CDC (Change Data Capture) for live databases
  • βœ“ Data validation and reconciliation
  • βœ“ Schema conversion and optimisation
🌐

Network & Connectivity

Ensuring seamless network connectivity before, during, and after migration.

  • βœ“ VPN and Direct Connect / ExpressRoute setup
  • βœ“ DNS migration and TTL management
  • βœ“ IP address mapping and SNAT/DNAT config
  • βœ“ Load balancer reconfiguration
  • βœ“ Traffic cutover with rollback trigger
βœ…

Post-Migration Validation

Systematic verification that everything works correctly in the new cloud environment.

  • βœ“ Functional and regression testing
  • βœ“ Performance benchmarking vs. on-prem
  • βœ“ Security posture verification
  • βœ“ Backup and DR validation
  • βœ“ Hypercare support for 30 days post-cutover
Cloud Migration illustration

Migrations Without Sleepless Nights

Every migration we run has a tested rollback. No surprises at 2 AM on cutover day.

πŸ—ΊοΈ

Dependency Mapping Before Moving Anything

Hidden application dependencies cause the most migration failures. We map every connection β€” databases, APIs, shared storage, authentication β€” before touching a single workload.

πŸ”„

Live Replication, Not Cutover Windows

Using continuous replication tools (AWS MGN, Azure Migrate), servers are replicated live while still running. The final cutover is measured in minutes, not hours.

βœ…

Data Validation at Every Step

After every database migration, we run automated row counts, checksum comparisons, and functional smoke tests. We never declare success without proving the data is intact.

πŸ›‘οΈ

Rollback Plan for Every Workload

Every migration wave has a documented, tested rollback procedure. DNS TTLs are pre-reduced. Old servers are kept running in parallel until validation is complete.

Platforms & Tools We Work With

πŸš€
AWS MGN
Server Migration
πŸ”΅
Azure Migrate
Migration Platform
πŸ”΄
OCI DMS
Oracle Migration
πŸ—„οΈ
AWS DMS
Database Migration
πŸ”„
CDC / Debezium
Live DB Sync
πŸ—οΈ
Terraform
IaC Provisioning
🐳
Docker / K8s
Containerisation
πŸ“¦
Ansible
Config Migration
🌐
Route 53 / Azure DNS
DNS Cutover
πŸ”
Nessus / Inspector
Security Validation

How We Onboard & Deliver

01

Discovery & Assessment

All applications catalogued, dependencies mapped, and cloud target architecture designed with migration waves defined.

02

Proof of Concept

One pilot workload migrated, tested, and validated end-to-end before the full programme begins.

03

Wave Execution

Workloads migrated in planned waves. Each wave tested and validated before the next begins. Rollback ready at all times.

04

Cutover & Hypercare

Final DNS cutover executed. 30-day hypercare period with priority support ensures stability in the new cloud environment.

Common Questions

Ready to Move to
the Cloud Safely?

Get a no-obligation cloud migration assessment β€” we will scope your workloads and design a migration plan.